Tender Notice

ZhongKang Construction Management (Group) CO. LTD
Add:Nanchang Honggutan Fenghe Avenue 1368 Honggu Newtown three
Service:0791-82222798
Technical:0791-82222823
Web:www.zkjsgl.com

Home > Tender Notice > Tender Notice > Qingyuan District, Ji'an City,, Tangguh Township construction of flood control projects

Qingyuan District, Ji'an City,, Tangguh Township construction of flood control projects

PublishDatetime:2017-1-11 17:34:34  Hits:1373
1 tender conditions
Of the tender Ji'an City,, Tangguh Township, Qingyuan District flood control projects by the superior authorities approved the construction of construction funds from the state investment, the tender human Tsing district township Flood Control Project Division, bidding agency Co., Ltd. for the construction management. The project has been with the tender conditions, the project construction and construction supervision for public tender.
(2) Project Description and scope of the tender
2.1 Location: Tsing district the Tangguh Township.
2.2 Lot division: construction tenders, supervision of a bid.
2.3 The scope of the tender: river dredging wrecker, reinforced levees, New embankment (the specific tender BOQ prevail).
2.4 Tender Amount: Bidding for construction of about 15 million yuan, supervision tender about 35 million.
2.5 Programme duration: 246 calendar days, is expected to start on April 30, 2013, and be completed by December 31, 2013.
2.6 Quality requirements: meet the national quality inspection and evaluation of qualified level.
3 bidders eligibility requirements:
3.1 Construction standard:
(1) have independent legal personality, water conservancy and hydropower project construction general contractor level and above qualifications.
(2) has a valid business license certificate.
(3) have a valid safety production license.
(4) The person in charge of the enterprise (referring to the legal representative) must be performed with water administrative department issued within the validity period of the Class A safety assessment certificate; intends to put into the project leader must perform Water Resources and Hydropower professional level and above (enterprises from other provinces Grade A) registered construction engineer license or temporary construction division practicing certificate and water administration authorities issued a valid Class B safety assessment certificate; under the Notice on Further Strengthening the management of water conservancy construction market "(Gan water construction and management Zi [2010] No. 192) requirements, temporary water conservancy and hydropower construction division registered post certificate issued by the provincial department of water administration must also obtain (province of temporary water conservancy and hydropower construction division to the latest list published on the website of the Department of Water Resources of Jiangxi Province ). To be invested in charge of the project (project manager) no construction in progress; technical person in charge must have the Water Conservancy professional Intermediate and above title; quality inspector must perform water conservancy effective quality inspectors certificate; full-time security staff must perform Province or above the water administrative department issued a valid Class C safety assessment certificate. The above personnel shall be the serving officers in this unit are required to provide evidence of labor contract (or social insurance and labor relations). Above are required to provide a valid ID card original.
Project manager (construction division) to be invested in accordance with the relevant provisions of the Jiangxi Provincial Department of Water Resources announced in the Jiangxi water conservancy construction enterprise personnel information notice "(Gan water construction and management Zi [2012] No. 133), must be present at the opening of tenders will. The construction division website of the Jiangxi Provincial Department of Water Resources announced "Jiangxi Gan water conservancy corporate officers Tables" (subject to the bid before the deadline last updated publicity), and can not be "water conservancy project in Jiangxi Province construction projects construction division "(to the tender closing time list shall prevail), otherwise it can not pass the qualification examination.
(5) construction enterprises of the non-water system of the province to be held by the Jiangxi Provincial Department of Water Resources "credit file" (a copy of the original issuing invalid); qualified legal representative must be present at the Review Conference, the legal representative (or authorized client) to be invested The project manager (construction division) must attend the opening meeting.
(6) Other requirements: commitment to a single contract amount of 11 million yuan and more small and medium-sized bidders for the past five years (January 1, 2008 to 2012 December 31, for the time limit to the signing of the construction contract time shall prevail) river management or dike results; shall at the same time provide the the winning notice (or construction contracts), completed (or put into use or completed) acceptance materials (the lack of any one be disqualified), and provides the results of public resources in Jiangxi Province The trading network storage and approval. During the Contract Award, the tender has the right to conduct site visits to the results provided by the public enterprises.
(7) According to "further strengthen and improve the management of water conservancy construction and clean government a number of opinions" (Gan Water built Guan Zi [2012] No. 341 the relevant provisions of the tender does not accept the construction of two divisions of construction enterprises from other provinces to participate in tender, the construction enterprises to participate in the construction division of the province's water conservancy project bidding, before the publicity of the tender successful candidate shall not be invested in other project bidding; after the announcement of the successful candidates, the first successful candidate shall not participate in the construction division next project bidding, Once found, repeat the tender invalid, the tender shall not be refunded; Second, the construction division of the third successful candidates to participate in the next project bidding, as construction companies take the initiative to give up the previous winning projects eligible.
3.2 supervision labeled:
(1) with independent legal personality and issued by the Ministry of Water Resources of the water conservancy project construction supervision B and above qualifications;
(2) has a valid business license, safety production license;
(3) The the provinces water system supervision units in the Department of Water Resources registration, and must be in the Jiangxi Provincial Department of Water Resources website Jiangxi Gan hydraulic engineering supervision corporate officers Statistics Query to;
(4) and have the appropriate skills in personnel, equipment, and funding, the total number of staff on-site supervision and professional equipment must be combined with the specific content of the work of the Commissioner of the organizing staff. Stationed at least 4 people, Director, supervising engineer and two members of the Commissioner.
Project Director Requirements: the engineer jobs Certificate must be issued by the Ministry of Water Resources of the national water conservancy construction supervision.
Supervising engineer requirements: must have a supervising engineer certificate issued by the Ministry of Water Resources.
Supervision of staff Requirements: You must have a national water conservancy construction supervision of staff qualifications.
3.3 The bidder is not in being ordered to suspend, cancel, suspend the tender qualification status of the Jiangxi Province Ji'an City water project.
3.4 The project consortium does not accept the qualification bid.
4 qualification
4.1 Construction standard: the tender pre-qualification with a limited number of system to limit the number of pre-qualified applicants over 30. Qualification way to see pre-qualification documents.
4.2 Supervision standard: pre-qualified system.
5 pre-qualification documents to obtain
5.1 Those who wish to participate in the tender applicant, on March 18, 2013 2013 March 24, 2007, on their own in Ji'an City People's Government Network, Ji'an City Public Resource Exchange website to download the pre-qualification documents, as required, the preparation of the eligibility review application documents.
5.2 pre-qualification documentation fees, construction standard of 200 yuan / home (not refundable), supervision standard 100 / home (non-refundable). Tender cash to pay the applicant to submit pre-qualification documents.
5.3 submit pre-qualification documents: at 8:30 on March 25, 2013 from 9 hours 30 minutes for the late delivery of pre-qualification documents not be accepted.
5.4 Pre-qualification time: 2013 at 10 am at 00 points.
6 The media announcement
The announcement in China Procurement and Bidding, Jiangxi bidding network the Ji'an City People's Government Network, Ji'an City trading center of public resources available online.
Tender; Tsing district township flood control projects
Contact: Mr. Yu
Tel: 0796-8107096
The tender Address: Qingyuan District Water hospital
Bidding agency: the construction management
Contact: Mr. Xiao
Tel: 18679614115
Address: Jian Ji Zhouqu Fuxing Road, No. 6
March 18, 2013